Tuesday, July 2, 2013

2nd July 2013

All electrical cabling was put in yesterday, along with light switches and powerpoints. The timber frame at the top of the facade was also put in yesterday. Today saw the data cabling put in and the place cleaned up and hosed out in preparation for the insulation and gyprocking. Insulation is supposed to be going in on Thursday with gyprock to start on Friday. The timber frame around the bath has also been put in.

We are supposed to be meeting Peter (the SS) on Thursday to check that all electrical cabling and points have been put in the correct positions. We are getting super excited as it hopefully won't be too much longer now and we will be at lock up stage.