Wednesday, August 7, 2013

7th August 2013

A lot happened today...

We were surprised today to find all sinks had been put in, the bath, all tapware, both shower rails and both toilets. I am assuming towel rails and toilet roll holders will be put in tomorrow as they had been delivered.

All built in wardobes and walk in wardrobe had shelving and rails, along with the linen closet, laundry broom closet and kitchen pantry.

Plumbing had been done as all taps were working.

The gas bayonet was installed.

Data points were also installed.

Oh and they also have done a bit of a site clean up out the front.

 
Laundry Tapware

 
Bedroom 3 Built In Cupboard

 
Toilet

 
Main Bathroom Shower Rail / Tap

 
Main Bathroom Sink / Tapware

 
Main Bathroom Bath / Tapware

 
Main Bathroom Bath / Sink / Tapware

 
Master Ensuite Shower Rail / Tap

 
Master Ensuite Sinks / Tapware

 
Master Ensuite Sinks / Tapware

 
Master Bedroom Walk In Robe

 
Master Bedroom Walk In Robe

 
Gas Bayonet

 
Kitchen Pantry

 
Kitchen Benchtops (covered now to protect them) / Tapware / Sink

 
Kitchen Benchtops (covered now to protect them) / Tapware / Sink

 
Kitchen Tapware / Sink / Filtered Water

 
Kitchen Tapware / Sink / Filtered Water

 
Kitchen Benchtops (covered now to protect them)

 
Laundry Broom Closet

 
Exterior Alarm Siren

 
A bit cleaner