We were surprised today to find all sinks had been put in, the bath, all tapware, both shower rails and both toilets. I am assuming towel rails and toilet roll holders will be put in tomorrow as they had been delivered.
All built in wardobes and walk in wardrobe had shelving and rails, along with the linen closet, laundry broom closet and kitchen pantry.
Plumbing had been done as all taps were working.
The gas bayonet was installed.
Data points were also installed.
Oh and they also have done a bit of a site clean up out the front.
Laundry Tapware
Bedroom 3 Built In Cupboard
Toilet
Main Bathroom Shower Rail / Tap
Main Bathroom Sink / Tapware
Main Bathroom Bath / Tapware
Main Bathroom Bath / Sink / Tapware
Master Ensuite Shower Rail / Tap
Master Ensuite Sinks / Tapware
Master Ensuite Sinks / Tapware
Master Bedroom Walk In Robe
Master Bedroom Walk In Robe
Gas Bayonet
Kitchen Pantry
Kitchen Benchtops (covered now to protect them) / Tapware / Sink
Kitchen Benchtops (covered now to protect them) / Tapware / Sink
Kitchen Tapware / Sink / Filtered Water
Kitchen Tapware / Sink / Filtered Water
Kitchen Benchtops (covered now to protect them)
Laundry Broom Closet
Exterior Alarm Siren
A bit cleaner