The painting has also finished. We noticed a few spots had been patched. The cutting in where the walls meet the cornices is pretty crappy. I could have done a lot better myself. I am assuming it is something we will have to fix ourselves, but I guess we will wait and see what they say when we do PCI.
Sinks and bath tub had been delivered and are ready to be installed. They may have been put in later this afternoon as we were at the house around 2pm.
We are starting to keep a record of the little things that will need fixing. Already we have noticed some bubbling in the cornice in the master bedroom, a gap above the laundry powerpoint, gaps above the kitchen wall cupboards, tiling in both bathrooms is missing grout in the corners, an area of the facade column is missing the bag & paint etc. You really start to notice things when the painting has finished.
Getting really excited. Won't be long now!
Master Bedroom Powerpoints
Master Ensuite Benchtop
Living Area Powerpoints + Ceiling Baton Fix
Kitchen Benchtop (Back Wall)
Kitchen Benchtop (Island Bench)
Media Room Powerpoint + Ceiling Baton Fix
Kitchen Benchtops taking shape
Kitchen Benchtops taking shape
Dining Room Powerpoint + Baton Fix
Bedroom 2 Powerpoint + Baton Fix
Bedroom 4 Built In Cupboards
Bedroom 4 Powerpoint + Ceiling Baton Fix
W.C
Main Bathroom Benchtop
Main Bathroom Benchtop
Activity Area Powerpoint, Ceiling Baton Fix + Smoke Alarm
Bedroom 4 Built In Cupboards
Bedroom 4 Doorway + Light Switch
Bedroom 4 Powerpoint
Laundry
Entrance Hall Ceiling Baton Fix, Alarm System
Entrance Hall Cutouts
Front Door Entrance